Over two winters, the NH Department of Transportation recorded an average of 242 plow hits per pavement line in their study and 13% of the white lines and 20% of the yellow lines were below the 40 mcd/m2/lux level that the FHWA research recommends. That study was on two-lane highways. Your lot has considerably slower traffic and much shorter lines, yet the same plow blades are going to be scraping the same paint. I’m the contractor who does the restriping on these lots, and we’ll tell you what’s going on with your lines and what you can do about it.
Why lines disappear in a winter lot
Highway crews just drive straight at a steady speed. The plow drivers in the apartment lot will reverse, pivot, and push snow into the corners (usually at night). They’re sitting high behind the blade and can’t see a four-inch stripe, so they’re steering from memory. That’s why the stall ends, and the fire lane corners get worn out first.
| Cause | What residents see | What we change |
| Blade scraping | Stall ends wear to bare asphalt by January | Restripe stall ends first and choose a tougher material |
| Snow berms and windrows | Stall lines vanish under packed piles | Mark curbs and add visible markers above the snowline |
| Ice bonded to paint | Paint peels off at thaw in patches | Apply paint on clean, dry pavement so it bonds fully |
| Salt film on dark asphalt | Gray haze that dulls white paint | Pick high-contrast paint and sweep early in spring |
The ice row is the most important. The Virginia study into snow removal damage found very little damage to the thermoplastic markings, presumably because the ice didn’t bond to them. The same study recommended that investment in pavement markings should be protected from plow damage.
Which marking material lasts through winter
Highway research gives us a useful point of comparison, and we’ve adjusted it for apartment lots where the plows don’t run quite as often.
| Material | Winter performance in research | Install condition |
| Paint | Paint-based systems, including advanced acrylic, lost retroreflectivity and presence by the end of the first winter in an Alaska and Tennessee test | Mild, dry weather |
| Thermoplastic | Held up well in Virginia where ice did not bond | Pavement at 50°F and air at 55°F |
| Tape | Lasted through two winters on the edge line, but cost the most and needed a groove where plows run | Grooved pavement and clean surface |
For the majority of apartment communities, we’d recommend thermoplastic or a hard-wearing coating on the stall ends, fire lanes, and entrance aisles, and then standard paint in the low-traffic rows. That splits your budget right where the plows are going to be doing the damage. As a rough guide, thermoplastic markings typically cost about two to three times more than standard paint per linear foot, but they can last two to three times as long. High-build paints and coatings fall in between in terms of both price and durability. By using premium materials only in high-wear areas, you can keep your overall costs down while still protecting the most vulnerable markings.
What we do to keep lines readable in snow
We’re all about the stopping places, as that’s what the residents and the plow drivers need more than anything else: clear stopping points.
- Restripe stall ends and fire lane edges first, since plows hit them most
- Add flexible plow stakes at fire lane corners and dead-end rows so drivers see the edge above the snowline
- Paint curb faces and wheel stop tops in high-contrast yellow where snow banks bury the lines
- Number stalls on curb faces or wall signs so residents find their space when lines disappear
- Keep accessible stall aisles and signs clear, since those markings carry legal weight
Check the work after we finish
A new stripe job should pass a quick inspection before the first storm. Use our guide, How to Inspect Apartment Parking Lot Markings After a Striping Project, to check edges, thickness, and coverage. If your fresh lines look patchy later, read What Causes Newly Painted Parking Lot Lines to Fade Unevenly? to find the cause.
Keep Your Apartment Parking Lot Markings Visible This Winter
Snow and ice can make parking lot lines harder to see, creating confusion for residents and visitors. The Pavement Group provides professional parking lot striping and pavement maintenance services to help apartment communities maintain organized, clearly marked parking areas. Let us help you prepare your property for winter conditions.
Contact Us TodayFrequently Asked Questions
Do glass beads or wet-reflective materials help lines show up in snowy conditions?
Standard glass beads do a good job of returning the headlight beam on dry tarmac; water changes that. The Ohio Department of Transportation found that water over a marking actually scatters the light rather than reflecting it back so wet lines appear quite dim. Wet reflective products use materials designed for water, and yet one highway agency reported that their wet reflectivity only lasts about two years. Snow, of course, still just covers the marking, and so you only get an improvement in night visibility on bare tarmac with reflective materials. We’ll always pair them with your pole lighting plan, as the brighter the lamp over the entrance, the better it is.
Can we repaint lines in winter if we missed the fall window?
Yes, with the right product and on a dry surface. Cold weather waterborne paint can go down to 35°F and up whereas standard paint requires warmer pavement. The Ohio DOT will only allow their cold weather paint to be applied by the crews between 35°F and 50°F. We apply it to bare, sweep-clean pavement and will not apply it on any day that has snow, ice, or standing water. It’s a temporary result that we then replace with the more durable markings in the spring.
How do we get our plow contractor to protect the lines?
Give the contractor a clearly marked site map showing the stall rows, fire lanes, and accessible spaces. The snow storage areas should be named in writing and be located off the stall lines and off the fire lane access. Ask the contractor which blade edge they run, as the Virginia study was specifically on the damage caused by carbide-tipped blades. Walk the site with the contractor after the first storm and take photos of any scrape marks. Add a clause to the contract making the plow company liable for any documented damage as a result of careless plowing.
Which faded markings should we restore first for safety and compliance?
Restore the fire lane markings first, as your local fire marshal can cite you for that. Then go on to the accessible stall markings (including the access aisle and the sign at the front of each stall). After that, the entrance arrows, stop bars, and crosswalks (as those are what prevent collisions at the busiest points). Regular stall lines can be left until last, as residents can still park in the stalls without them for a short period of time. Check your local city or county code, as each has its own requirements.
When should we restripe after the last snow melts?
Wait until the last plow event has gone and the pavement is dry. Sweep first, as the winter sand and salt dust will break down the paint/asphalt bond. In the snow-prone southern markets (Dallas, Atlanta, etc.), restriping can get underway as early as February. In the more northerly markets (Buffalo, Minneapolis, etc.), you’ll often be waiting until April or May. We schedule on pavement temperature and the forecast, not the calendar. When your job is complete, we’ll walk the lot with you to check every stall end and fire lane line is correct before the residents even notice.
About the Author
The Pavement Group specializes in asphalt engineering, pavement maintenance solutions, and data-driven asset management for commercial, retail, and multi-family residential properties. Utilizing advanced structural pavement evaluations and capital planning transparency, The Pavement Group works directly with property managers to extend pavement lifecycles, eliminate liability risks, and optimize long-term infrastructure investments.